Additional Resources
After Approval

About

This application is for communication towers.

The purpose of these regulations is to protect the public health, safety, and welfare by regulating the location of communication facility structures. Compliance with these regulations and issuance of a permit under these regulations shall not be construed as a determination that a facility is in compliance with other regulations or statutes.

After Approval

Once the application, plans, and permits have been approved, the subsequent phase involves commencing the construction process. Construction begins either when the construction materials are delivered to the site or when the ground is broken.

The following steps are typically carried out during the construction phase:

As-Built and pre-Inspection document (if required as per permit regulations)
Inspections
Power release

Schedule Online

Schedule Online

The Communication Tower inspection will be conducted by the Harris County Development Inspection Group. In order to request your inspection, please log in to ePermits and submit your inspection request or use the link below to submit your Inspection request.

Request your inspection via the Inspection Request Form

Contact

Contact

Contact E-Permits Support
Permits Main Phone
(713) 274-3900

Check Plan Status

Check Plan Status

Please use the link below to review your project status. You will need your project number (ex. 2301010001).

Apply
Conditions & Exceptions
What You Need To Know

Apply

Here are the steps for applying through E-Permits:

  1. Access the E-Permits platform and log in
  2. Navigate to the "Projects" section
  3. Click on "Apply"
  4. Locate your address on the map by either entering it or zooming in and double-clicking on the location
  5. A "Red Pin" will appear on the map, and all associated data will be retrieved by E-Permits. If the address is incorrect, you can correct it on the next page
  6. Click on the green "Apply" button
  7. In the selection labeled "Application," choose " Cellular Communications Tower"
  8. Provide the required detailed information and click on "Next"
  9. Complete the application page and click on "Next"
  10. Upload all the necessary documents, and once finished, click on "Next"
  11. Finally, review the disclaimer, select "Agree," and then click on "Submit Application"

Conditions & Exceptions

Conditions & Exceptions

  • Extending tower no less than 10 ft and replacing existing cabinets and antennas with new ones.

What You Need To Know

New Tower

  • Site plan of entire property showing proposed and existing plans
  • New development must go through commercial site development for commercial review concurrent with tower review
  • A 300-foot radius from the proposed tower and distance to the nearest boundary of the residential subdivision by a licensed surveyor
  • A copy of all recorded plats within a 300-foot radius and a copy of the deed of the nearest residential lot, if any
  • Cross section with a height of the tower
  • FAA and/or FCC approval(s)
  • Complete application (only for over-the-counter submittals
  • Floodplain information (if in the floodplain)


Existing Tower

  • Engineering site plan showing proposed and existing plans
  • Engineering floodplain information (if in the floodplain)
  • If extending existing tower by 10 ft, new tower application required

Plan Review

Required

Administrative Fee
Construction Expiration

180 Days from issuance

Processing Time

5 Business Days

Inspection
Required
Renewals

N/A