When the receipt of the fire marshal’s email of approval has been received for the pre-inspection documents to request the fire inspection, complete the inspection request form entering the required information and submit to Fire Inspection Forms

Schedule By Phone

Once the inspection request has been submitted and you need to obtain information regarding your request, contact the Harris County Fire Marshal’s Office at 713-274-1730 or email [email protected]

Apply

Apply

ONLINE ELECTRONIC PLAN SUBMITTAL – E-PERMITS

ePermits

First time users will need to register for an account.

Make sure you are selecting the correct application type in order to avoid any unexpected delays!  You could be using the Fire Protection application.

What You Need
Submit Plans

What You Need

HARRIS COUNTY STANDPIPE SYSTEM PLAN SUBMITTAL CHECKLIST

  • Name of owner and/or occupant per Harris County permit
  • Location, including correct street address (HC permit & plan addresses must match)
  • Name, address, and phone number of the installing company
  • Drawings must be stamped/signed/dated by R.M.E., Name, Address and Phone Number of Installing Company 

Submit Plans

Application and plans will be reviewed and processed.

About
Additional Resources
After Approval

About

Standpipe System

This will be a deferred plan submittal.

A Standpipe system is an arrangement of piping, valves hose connections and allied equipment installed in a building or structure, with the hose connections located in such a manner that water can be discharged in streams though attached hose and nozzles, for the purposes of extinguishing a fire, thereby protecting a building or structure and its contents in addition to protecting the occupants.

After Approval

After approval, you can pay fees online from your ePermits account.Once fees are paid you can download the approved plans and print out a paper copy of the permit. Please post the permit fully visible on project site and have a paper copy of the approved plans onsite during construction.

Contact

Contact

Fire Code Review Group 

(713) 274-3922 

Email: Fire Code Review Group

Permits Main Phone 

(713) 274-3900

Plan Review

6 Months

Processing Time

15 Business Days

Admin Fee
Valid Period

N/A

Inspection

Required

Renewal

Not Required

© Copyright 2025 Office of the County Engineer