Lienholder's Subordination to Dedication - Lienholders must either sign the plat or execute a Lienholder’s Subordination to Dedication document as promulgated by the Harris County Engineer.
- Last modified: 02/29/2016
| Lienholders must either sign the plat or execute a Lienholder’s Subordination to Dedication document as promulgated by the Harris County Engineer. | 02/29/2016 | Open Doc |
Lienholder's Subordination to Dedication Instructions - Requirement for ATUs installed in impaired water sheds
- Last modified: 02/29/2016
| Requirement for ATUs installed in impaired water sheds | 02/29/2016 | Open Doc |
Owner's Ratification of a Plat - Owners of property located within the plat must either sign the plat or execute an Owner’s Ratification of Plat document, as promulgated by the County Engineer.
- Last modified: 02/29/2016
| Owners of property located within the plat must either sign the plat or execute an Owner’s Ratification of Plat document, as promulgated by the County Engineer. | 02/29/2016 | Open Doc |
Owner's Ratification of a Plat - Instructions - required form for wastewater treatment plant reviews
- Last modified: 02/29/2016
| required form for wastewater treatment plant reviews | 02/29/2016 | Open Doc |
Request for Non-duplication of Subdivision Name Letter (HC Tax Office) - A letter from the County Tax Assessor-Collector certifying that the name of the subdivision to be presented to Commissioners’ Court is not in conflict with any other previously recorded subdivision.
- Last modified: 01/13/2021
| A letter from the County Tax Assessor-Collector certifying that the name of the subdivision to be presented to Commissioners’ Court is not in conflict with any other previously recorded subdivision. | 01/13/2021 | Open Doc |
Self Selection Checklist - An application for Final Plat review for RECORDATION in the ETJ and NO ETJ jurisdiction (not applicable for COH ETJ)
- Last modified: 05/04/2023
| An application for Final Plat review for RECORDATION in the ETJ and NO ETJ jurisdiction (not applicable for COH ETJ) | 05/04/2023 | Open Doc |
Utility Letter - A completed Utility Service Plan, as promulgated by the County Engineer, shall be submitted. In no case shall a plat be recorded prior to assurances being given that all applicable State and County reviews and/or permit(s) have been obtained.
- Last modified:
| A completed Utility Service Plan, as promulgated by the County Engineer, shall be submitted. In no case shall a plat be recorded prior to assurances being given that all applicable State and County reviews and/or permit(s) have been obtained. | | Open Doc |
Utility Service Plan (04/2023) - A completed Utility Service Plan, as promulgated by the County Engineer, shall be submitted. In no case shall a plat be recorded prior to assurances being given that all applicable State and County reviews and/or permit(s) have been obtained.
- Last modified: 04/11/2023
| A completed Utility Service Plan, as promulgated by the County Engineer, shall be submitted. In no case shall a plat be recorded prior to assurances being given that all applicable State and County reviews and/or permit(s) have been obtained. | 04/11/2023 | Open Doc |