Office of the County Engineer

Where can I call for inspection questions?
Where can I get the most up-to-date information from Harris County Permits?
Where can I call for Design or Permit questions?
How long does it take to get a Permit approved?
When designing my Stormwater Quality basin, do I require a 24 or 48-hour draw-down time?
How do I obtain a Certificate of Compliance (COC)?
When can I submit an application?
If required, when should I obtain my Harris County Stormwater Quality Permit?
What is the Stormwater Quality Program about?
What is the difference between the SWPPP and the SWQMP?
When does the one-year period for permit renewal begin?
How long should the NOI be posted?
When are Filter Fabric, Rock Filter Damns, and Reinforced Filter Fabric fences used for the construction phase?
Can I start clearing and grubbing without a TPDES Construction General Permit?
How can a project be grandfathered?
When is an SWQMP and SWQ Permit required?
Where do I post the TCEQ Permit/NOI?
Do I need a Notice of Intent (NOI)?
If I receive an inspection notice, how much time do I have to correct the deficiencies noted at my site?
How do I obtain an NOI?
Can we come in and visit/review drawings with you?
When is a Stormwater Pollution Prevention Plan (SWPPP) required?
© Copyright 2025 Office of the County Engineer