Whenever any person, firm, corporation, or individual shall contemplate, or be engaged in hauling any load or loads, which by virtue of the great weight or great number of same, are calculated to damage any paved or graded road to an extent greater than the average wear and tear to which the road is ordinarily subjected by the travel of the public a Right-of-Way notification is required.