To obtain a permit you must:
1. Fill out an application.
2. Submit application with one (1) sets of OSSF drawings.
3. Submit a site evaluation report.
The drawings and site evaluation must be done by either a registered professional engineer or a registered sanitarian. Engineers and sanitarians advertise in the yellow pages under Engineers and Septic or you may obtain a list of engineers, sanitarians, and septic installers from the Permit Office. According to reports by homeowners, engineers and sanitarians, these services generally cost between $300 and $700. Three to five days should be allowed for review of plans and supporting documents.
Since Harris County cannot issue a development (building) permit until after the permit to install and operate the on-site sewage facility is issued, you should start well in advance so that the issuance of your development permit will not be delayed.